X50 20071105 016 QCOM X P0054 610 UMB HRPD CMIP Based Call Flows doc
Size: 404 KB
Pages: n/a
Date: 2010-12-25
Related Documents
Size: 479 KB
Pages: n/a
Date: 2010-11-23
Title: CMIP Based Approach Call Flow for UMB-HRPD Handoff Abstract: This contribution proposed a call flow of CMIP Based.
Size: 485 KB
Pages: n/a
Date: 2010-11-28
Title: CMIP Based Approach Call Flow for UMB-HRPD Handoff Abstract: This contribution proposed a call flow of CMIP Based.
Size: 515 KB
Pages: n/a
Date: 2012-01-01
Title: CMIP/PMIP Based Approach Call Flow for UMB-HRPD Handoff Abstract: This contribution proposed a call flow of CMIP/PMIP Based.
Size: 590 KB
Pages: n/a
Date: 2011-12-25
Title: QoS with SBBC in UMB Abstract: This contribution proposed call flows for QoS with SBBC support in UMB. Source: Haipeng Jin/Jun Wang.
Size: 620 KB
Pages: n/a
Date: 2012-04-17
Title: WIMAX-HRPD dormant handoff call flows File: FILENAME MERGEFORMAT SS-MOT-CSCO WiMAX to HRPD handoff dormant call flows.
Size: 304 KB
Pages: n/a
Date: 2011-12-22
TITLE: X. P0057-0 – Section 13 – Active handoff from HRPD to E-UTRAN DATE: February 18, 2008 SOURCE: Jingyi Zhou – Verizon Email:.
Size: 201 KB
Pages: n/a
Date: 2011-12-22
TITLE: X. P0057-0 – Section 13 – Active handoff from HRPD to E-UTRAN DATE: February 18, 2008 SOURCE: Jingyi Zhou – Verizon Email:.
Size: 551 KB
Pages: n/a
Date: 2011-12-30
Title: Inter-AGW Fast Handoff using PMIPv6 Source: EMBED MSDraw. Drawing. 8. 1 Parviz Yegani HYPERLINK mailto:pyegani cisco. com pyegani.
Size: 164 KB
Pages: n/a
Date: 2013-01-23
TSG-X WG-5 TITLE: WiMAX-HRPD Interworking: IPsec Tunnel Establishment SOURCE: Violeta Cakulev HYPERLINK mailto:cakulev alcatel-lucent. com cakulev alcatel-lucent.
Size: 836 KB
Pages: n/a
Date: 2012-01-06
Title: Femto Stage 2 Call Flows Abstract: This contribution proposes a few stage 2 call flows to be included in section 9 of X. P0059-100. Source:.
Size: 127 KB
Pages: n/a
Date: 2012-01-13
Title: UMB-HRPD/1x Interworking DHCP and DNS Lookup Updates Abstract: This contribution proposed to modify current working baseline text on DHCP.
Size: 604 KB
Pages: n/a
Date: 2011-12-29
Title: Add UMB-1x Interworking in X. P0054-610 Abstract: This contribution proposed to add UMB-1x Interworking in X. P0054-610 in addition to UMB-HRPD interworking Source: Tsunehiko.
Size: 600 KB
Pages: n/a
Date: 2011-12-29
Title: Add UMB-1x Interworking in X. P0054-610 Abstract: This contribution proposed to add UMB-1x Interworking in X. P0054-610 in addition to UMB-HRPD interworking Source: Jun Wang/Masa.
Size: 350 KB
Pages: n/a
Date: 2013-01-23
Abstract: This contribution proposed MIPv4 HoA Assignment in CAN. Source: Kyungjoo Grace Suh Jun Wang , BeomSik Bae Samsung HYPERLINK mailto:joo. suh samsung. com joo. suh samsung.
Size: 899 KB
Pages: n/a
Date: 2012-01-06
Title: Anchored AGW Handoff Abstract: This contribution proposed a call flow of anchored AGW for inter-AGW handoff through network PMIP. Source:.
Size: 633 KB
Pages: n/a
Date: 2011-02-20
Title: UMB-HRPD Interworking Architecture Abstract: This contribution proposed the architectures of UMB-HRPD Interworking Architecture. Source: Jun Wang QUALCOMM Inc. HYPERLINK.
Size: 2.8 MB
Pages: n/a
Date: 2011-10-28
Contents TOC o 2-3 h z t Heading 1 nn,1,Heading 1 nb,1 HYPERLINK l _Toc191309312 1 Introduction PAGEREF _Toc191309312 h 1 HYPERLINK l _Toc191309313 1. 1 Scope PAGEREF _Toc191309313 h 1 HYPERLINK l _Toc191309314.
Size: 505 KB
Pages: n/a
Date: 2011-11-05
This contribution includes example call flows for WiMAX to HRPD active handoff when CMIPv4 is used in the HRPD network, and either.
Size: 188 KB
Pages: n/a
Date: 2011-10-30
TSG-X TITLE: IPsec in UMB-HRPD Handoff SOURCE: SHAPE MERGEFORMAT ABSTRACT: This contribution describes IPsec Solution to resolve reachability.
Size: 364 KB
Pages: n/a
Date: 2012-01-01
Size: 111 KB
Pages: n/a
Date: 2010-12-03
TSG-X WG-5 TITLE: WiMAX-HRPD Interworking: IPsec Tunnel Establishment SOURCE: Violeta Cakulev HYPERLINK mailto:cakulev alcatel-lucent. com cakulev alcatel-lucent.
Size: 95 KB
Pages: n/a
Date: 2010-12-02
Size: 95 KB
Pages: n/a
Date: 2010-11-27
Size: 159 KB
Pages: 7
Date: 2012-07-04
80-VXXX- X A July 2008 Page 1QUALCOMM Confidential and Proprietary QUALCOMM Inc. Jun Wang, George Cherian, Masa Shirota 2009. All rights reserved.
Size: 111 KB
Pages: n/a
Date: 2011-11-05
TSG-X WG-5 TITLE: WiMAX-HRPD Interworking: IPsec Tunnel Establishment SOURCE: Violeta Cakulev HYPERLINK mailto:cakulev alcatel-lucent. com cakulev alcatel-lucent.
Size: 593 KB
Pages: n/a
Date: 2011-11-03
Title: WIMAX-HRPD handoff call flows File: FILENAME MERGEFORMAT mot WiMAX to HRPD handoff call flows. doc Abstract: The contribution proposes.
Size: 191 KB
Pages: n/a
Date: 2011-11-03
TSG-X WG5 TITLE: WiMAX-HRPD Interworking – IPsec Tunnel Establishment SOURCE: Violeta Cakulev, HYPERLINK mailto:cakulev alcatel-lucent. com cakulev alcatel-lucent. com Alcatel.
Size: 704 KB
Pages: n/a
Date: 2011-03-16
Title: Femto Remote IP Access Call Flows Abstract: The concept of femto Remote IP Access has been approved. This contribution proposes.
Size: 712 KB
Pages: n/a
Date: 2013-01-05
Title: PMIP Tunnel Operation with U6 Binding in CAN Abstract: This contribution proposed methods for PMIP tunnel operation between the SRNC.
Size: 765 KB
Pages: n/a
Date: 2012-12-13
Title: PMIP Tunnel Operation with Multiple Binding in CAN Abstract: This contribution proposed methods for PMIP tunnel operation with.
Size: 702 KB
Pages: n/a
Date: 2011-10-26
Title: Femto Remote IP Access Call Flows Abstract: The concept of femto Remote IP Access has been approved. This contribution proposes.
Size: 927 KB
Pages: n/a
Date: 2011-12-31
Title: WIMAX-HRPD handoff call flows File: FILENAME MERGEFORMAT mot WiMAX to HRPD handoff call flows. doc Abstract: The contribution proposes.
Size: 571 KB
Pages: n/a
Date: 2011-12-29
TSG-X WG5 Title: HRPD-to-WiMAX Active Handoff Call Flow SOURCE: Vojislav Vucetic HYPERLINK mailto:vvucetic cisco. com vvucetic cisco. com EMBED.
Size: 164 KB
Pages: n/a
Date: 2011-12-28
TSG-X WG-5 TITLE: WiMAX-HRPD Interworking: IPsec Tunnel Establishment SOURCE: Violeta Cakulev HYPERLINK mailto:cakulev alcatel-lucent. com cakulev alcatel-lucent.
Size: 653 KB
Pages: n/a
Date: 2011-12-02
Title: Femto Stage 2 Call Flows: Initialization Aspects using Control plane based Position Location as an example Abstract: This.
Size: 703 KB
Pages: n/a
Date: 2013-02-21
TSG-X WG5 Title: HRPD-to-WiMAX Active Handoff Call Flow SOURCE: Vojislav Vucetic HYPERLINK mailto:vvucetic cisco. com vvucetic cisco. com EMBED.
Size: 534 KB
Pages: n/a
Date: 2011-03-19
Title: HRPD-UMB handoff call flows File: FILENAME MERGEFORMAT HRPD-UMB handoff call flows QC Abstract: The contribution proposes a call.
Size: 533 KB
Pages: n/a
Date: 2012-01-02
Title: HRPD-UMB handoff call flows File: FILENAME MERGEFORMAT HRPD-UMB handoff call flows QC Abstract: The contribution proposes a call.
Size: n/a
Pages: n/a
Date: 2011-12-29
Size: 459 KB
Pages: n/a
Date: 2010-12-13
TSG-A. 4 TITLE: WiMAX-HRPD Handoff Call Flow SOURCE: Bill Semper Tel. 1-972-761-7996 HYPERLINK mailto:b. semper samsung. com b. semper samsung.
Size: 445 KB
Pages: n/a
Date: 2011-03-22
Title: PCC for cdma2000 1x and HRPD - MS Init Simple IP Call Flow Abstract: This contribution proposes MS Initiated Call Flow for Simple IP Operation.
Size: 304 KB
Pages: n/a
Date: 2011-03-20
Title: PCC for cdma2000 1x and HRPD - PMIP Call Flows Abstract: This contribution proposes NW Initiated QoS Call Flow for PMIP Operation Source:.
Size: 465 KB
Pages: n/a
Date: 2011-01-01
Title: PCC for cdma2000 1x and HRPD - MS Init Simple IP Call Flow Abstract: This contribution proposes MS Initiated Call Flow for Simple IP Operation.
Size: 471 KB
Pages: n/a
Date: 2010-12-09
Title: PCC for cdma2000 1x and HRPD - NW Init Simple IP Call Flow Abstract: This contribution proposes Network Initiated Call Flow for Simple.
Size: 137 KB
Pages: 13
Date: 2012-10-22
Jun Wang and George Cherian, Qualcomm Incorporated, jwang qualcomm. com , gcherian qualcomm. com.
Size: 119 KB
Pages: n/a
Date: 2011-11-05
The requirements for WiMAX-to-HRPD PMIP-based handoff are specified in this section. PMIPv4 or PMIPv6 is used in both the HRPD and the WiMAX systems. PMIPv6-Based Approach.
Size: 572 KB
Pages: n/a
Date: 2011-10-28
SOURCE: Rajesh Bhalla rabhalla zteusa. com ABSTRACT: This contribution proposes the Call Flows for supporting Accounting at the HA/LMA for cdma2000 systems.
Size: 747 KB
Pages: n/a
Date: 2011-06-05
Size: 154 KB
Pages: 9
Date: 2011-05-02
1 Motorola PMIPv4 Call Flows: Bearer Setup with Dual Anchoring Parviz YeganiVojisla v 408 832-5729 732 706-0496 847 435-2715 pyegani cisco.
Size: 334 KB
Pages: n/a
Date: 2011-04-14
Title: PCC for cdma2000 1x and HRPD - PMIP Call Flows Abstract: This contribution proposes MS Initiated QoS Call Flow for PMIP Operation Source:.


Comments (not logged in)