tirno04r00009amend1 section j rev1 doc
Size: 261 KB
Pages: n/a
Date: 2011-07-23
Related Documents
Size: 66 KB
Pages: 22
Date: 2011-06-08
FILES ACTIVITY SECTION J LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS SECTION J- TABLE OF CONTENTS ATTACHMENT TITLE J-1 Department of Labor Wage.
Size: 2.5 MB
Pages: n/a
Date: 2013-04-28
! ,- Doug Paul- ORNL Site Office SNS- Facility Oversight paulde ornl. gov Post-Operations Section.
Size: 57 KB
Pages: n/a
Date: 2011-06-13
F. 1. 52. 252-2 CLAUSES INCORPORATED BY REFERENCE FEB 1998 This contract incorporates one or more clauses by reference, with the same force and effect as if they.
Size: 261 KB
Pages: n/a
Date: 2011-06-03
ATTACHMENT TITLE J-1 Department of Labor Wage Determination Number/Area J-2 Deleted J-3 Department of The Treasury Small, HUBZone Small, Small Disadvantaged, Women-Owned.
Size: 229 KB
Pages: n/a
Date: 2011-10-28
B. 1 CONTRACT LINE ITEMS CLINS AND CONTRACT SUB-CONTRACT LINE ITEMS SUB-CLINS The Service Provider SP shall furnish IRS Files Activity support.
Size: 123 KB
Pages: n/a
Date: 2011-07-30
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon.
Size: 261 KB
Pages: n/a
Date: 2011-07-23
ATTACHMENT TITLE J-1 Department of Labor Wage Determination Number/Area J-2 Deleted J-3 Department of The Treasury Small, HUBZone Small, Small Disadvantaged, Women-Owned.
Size: 80 KB
Pages: n/a
Date: 2012-10-22
FORMTEXT PIPING SPECIALTIES PART I GENERAL Summary Related Sections Section 15105 - Pipes and Tubes Section 15110 – Valves Section.
Size: 62 KB
Pages: n/a
Date: 2010-11-12
FORMTEXT MEMBRANE ROOFING PART I GENERAL RELATED SECTIONS Section 07050 - Basic Thermal and Moisture Protection Materials and Methods Section.
Size: 63 KB
Pages: n/a
Date: 2012-01-01
FORMTEXT RE-ROOFING PART I GENERAL RELATED SECTIONS Section 07050 - Basic Thermal and Moisture Protection Materials and Methods Section 07200.
Size: 62 KB
Pages: n/a
Date: 2011-12-31
FORMTEXT SITE PREPARATION PART I GENERAL SECTION INCLUDES All site clearing work. Related Section 01350 - Special Procedures Section.
Size: 66 KB
Pages: n/a
Date: 2011-12-29
FORMTEXT electrical system start-up PART I GENERAL SPECIFIED ELSEWHERE: Section 01810 - Commissioning Section 16060 – Grounding and Bonding Section.
Size: 133 KB
Pages: n/a
Date: 2011-12-10
FORMTEXT TESTING, ADJUSTING, AND BALANCING PART I GENERAL RELATED SECTIONS Section 15105 - Pipes and Tubes Section 15110 – Valves Section.
Size: 80 KB
Pages: n/a
Date: 2011-11-25
FORMTEXT PIPING SPECIALTIES PART I GENERAL Summary Related Sections Section 15105 - Pipes and Tubes Section 15110 – Valves Section.
Size: 57 KB
Pages: n/a
Date: 2011-01-07
UIUC FACILITIES STAN DARDS SYSTEMSTART- UP SECTION 16955 ELECTRICAL SYSTEMSTART- UP PART I GENERAL 1. 01 SPECIFIED ELSEWHERE: A. Section 01810 - Commissioning.
Size: 324 KB
Pages: n/a
Date: 2011-01-01
UIUC FACILITIES STANDARDS 15820-1DUCT ACCESSORIES SECTION 15820 DUCT ACCESSORIES PART I. GENERAL 1. 01 SUMMARY A. SECTION INCLUDES 1. Provide materials,.
Size: 133 KB
Pages: n/a
Date: 2011-11-01
FORMTEXT TESTING, ADJUSTING, AND BALANCING PART I GENERAL RELATED SECTIONS Section 15105 - Pipes and Tubes Section 15110 – Valves Section.
Size: 80 KB
Pages: n/a
Date: 2011-10-27
FORMTEXT PIPING SPECIALTIES PART I GENERAL Summary Related Sections Section 15105 - Pipes and Tubes Section 15110 – Valves Section.
Size: 257 KB
Pages: n/a
Date: 2012-10-22
UIUC FACILITIES STAN DARDS 15905-1HVAC INSTRUMENTATION SECTION 15905 HVAC INSTRUMENTATION PART I GENERAL 1. 01 SECTION INCLUDES A. Electronic Sensors,.
Size: 91 KB
Pages: n/a
Date: 2012-10-22
FORMTEXT PACKAGED COOLING TOWERS PART I GENERAL RELATED DOCUMENTS Related Sections: The following Sections contain requirements that relate.
Size: 71 KB
Pages: 5
Date: 2012-01-13
HPS Accelerator Section Officers Chronologic Listing 7/10/11 Rev. 1; Orig. 2/27/10 Officers Chronologic Listing Health Physics Societys Accelerator Section.
Size: 160 KB
Pages: n/a
Date: 2012-01-10
UIUC FACILITIES STAN DARDS CONTROLS SECTION 15920 PNEUMATIC CONTROLS PART I GENERAL 1. 01 SECTION INCLUDES A. Control Air Compressor Units.
Size: 536 KB
Pages: n/a
Date: 2012-01-04
UIUC FACILITIES STAN DARDS 15720-1 AIRHANDLING UNITS SECTION 15720 AIR HANDLING UNITS PART I. GENERAL 1. 01 SUMMARY A. SECTION INCLUDES.
Size: 64 KB
Pages: n/a
Date: 2011-12-31
FORMTEXT ROOF SPECIALTIES AND ACCESSORIES PART I GENERAL RELATED SECTIONS Section 07050 - Basic Thermal and Moisture Protection Materials and Methods.
Size: 75 KB
Pages: n/a
Date: 2011-11-06
FORMTEXT Mechanical system start-up PART I GENERAL RELATED SECTIONS Section 01732 – Construction IAQ Management Plan Section 01810 - Commissioning.
Size: 89 KB
Pages: n/a
Date: 2011-12-06
FORMTEXT Building automation systems PART I GENERAL SECTION INCLUDES This section includes the Building Automation and Integration scope of Work.
Size: 91 KB
Pages: n/a
Date: 2011-11-23
FORMTEXT PACKAGED COOLING TOWERS PART I GENERAL RELATED DOCUMENTS Related Sections: The following Sections contain requirements that relate.
Size: 303 KB
Pages: n/a
Date: 2011-11-22
UIUC 17810-1DIRECT DIGITAL CONTR OL SYSTEMS SECTION 17810 DIRECT DIGITAL CONTR OL SYSTEMS PART I GENERAL 1. 01 SECTION INCLUDES A. Standalone.
Size: 331 KB
Pages: n/a
Date: 2011-11-15
UIUC FACILITIES STANDARDS15810- 1 DUCTS SECTION 15810DUCTS PART I. GENERAL 1. 01 SUMMARY A. SECTION INCLUDES 1. Provide materials, devices, labor and supervision.
Size: 89 KB
Pages: n/a
Date: 2011-11-12
FORMTEXT Building automation systems PART I GENERAL SECTION INCLUDES This section includes the Building Automation and Integration scope of Work.
Size: 161 KB
Pages: n/a
Date: 2011-11-09
UIUC FACILITIES STAN DARDS 16210-1POWER MONITOR SECTION 16210 POWER MONITOR PART I GENERAL 1. 01 SUMMARY A. This section describes.
Size: 89 KB
Pages: n/a
Date: 2011-06-01
FORMTEXT Building automation systems PART I GENERAL SECTION INCLUDES This section includes the Building Automation and Integration scope of Work.
Size: 232 KB
Pages: n/a
Date: 2011-04-08
UIUC FACILITIES STANDAR DS 15840-1 AIRTERMINAL UNITS SECTION 15840 AIR TERMINAL UNITS PART I GENERAL 1. 01 SUMMARY A. SECTION INCLUDES 1. Provide.
Size: 25 KB
Pages: n/a
Date: 2011-03-29
UIUC FACILITIES STAN DARDS 16130-1BOXES SECTION 16130 BOXES PART I GENERAL 1. 01 QUALITY ASSURANCE A. All boxes shall meet the requirements.
Size: 17 KB
Pages: n/a
Date: 2011-03-22
UIUC FAC ILITIES STANDARDS AND DAMPPROOFING SECTION 07100 WATERPROOFING AND DA MPPROOFING PART I GENERAL 1. 01 PART 2 PRODUCTS 2. 01 BELOW GRADE DAMPPROOFING A. Provide.
Size: 18 KB
Pages: n/a
Date: 2011-03-19
UIUC FACILITIES STAN DARDS 08520-1ALUMINUM WINDOWS SECTION 08520 ALUMINUM WINDOWS PART I GENERAL 1. 01 SUMMARY A. Aluminum windows are preferred.
Size: 67 KB
Pages: n/a
Date: 2011-03-10
FORMTEXT Low Voltage Raceways PART I GENERAL SUMMARY The purpose of this Section is to set forth raceway requirements for permanently installed low voltage circuits.
Size: 13 KB
Pages: n/a
Date: 2011-02-22
UIUC FACILITIES STAN DARDS 16270 -1TRANSFORMERS SECTION 16270 TRANSFORMERS PART I GENERAL 1. 01 PROCEDURE TO ESTABLISH TRANSFORMER CAPACITY A. Occupancy.
Size: 68 KB
Pages: n/a
Date: 2011-02-20
FORMTEXT Campus Lighting PART I GENERAL RELATED DOCUMENTS: Section 01600 – Product Requirements Drawing 16520-1, Street Light Installation.
Size: 74 KB
Pages: n/a
Date: 2011-02-20
FORMTEXT SECONDARY UNIT SUBSTATIONS PART I GENERAL RELATED DOCUMENTS Section 01600 – Product Requirements Drawing 16364-1, Transformer Room.
Size: 90 KB
Pages: n/a
Date: 2011-02-17
FORMTEXT POWER MONITOR PART I GENERAL SUMMARY This section describes the requirements for the installation of Power Monitors and associated hardware within.
Size: 148 KB
Pages: n/a
Date: 2010-12-24
FORMTEXT AIR CLEANING DEVICES PART I GENERAL SUMMARY SECTION INCLUDES Provide materials, devices, labor and supervision necessary to install filter.
Size: 64 KB
Pages: n/a
Date: 2010-12-04
FORMTEXT EXTERIOR SIGNS PART I GENERAL SPECIFIED ELSEWHERE Section 10432 – Exterior Signs Accessible Entries RELATED DRAWINGS Drawing.
Size: 16 KB
Pages: n/a
Date: 2010-11-17
UIUC FACILITIES STAN DARDS 17760-1CLOCK AND PROGRAM SYSTEMS SECTION 17760 CLOCK AND PROGRAM SY STEMS PART I GENERAL 1. 01 PART 2 PRODUCTS.
Size: 161 KB
Pages: n/a
Date: 2010-11-12
FORMTEXT MECHANICAL INSULATION PART I GENERAL SUMMARY Section includes mechanical insulation for piping, ductwork, and equipment. No Asbestos Containing Materials.
Size: 173 KB
Pages: n/a
Date: 2010-11-12
FORMTEXT FANS PART I. GENERAL SUMMARY SECTION INCLUDES Provide materials, devices, labor and supervision necessary to install fans and related.
Size: 20 KB
Pages: n/a
Date: 2012-01-06
UIUC FA CILITIES STANDARDS 07631-1GUTTERS AND DOWNSPOU TS SECTION 07631 GUTTERS AND DOWNSPOU TS PART I GENERAL 1. 01 STANDARDS A. All gutter, downspout, and other roof.
Size: 65 KB
Pages: n/a
Date: 2012-01-06
FORMTEXT Switchboards PART I GENERAL RELATED DOCUMENTS Section 01600 – Product Requirements Exhibit 01600-1, Brand Name Products PART.
Size: 80 KB
Pages: n/a
Date: 2012-01-06
FORMTEXT STORM sewerage PART I GENERAL SECTION INCLUDES Storm sewer system and appurtenances. RELATED DOCUMENTS Storm Water Drainage.
Size: 70 KB
Pages: n/a
Date: 2012-01-02
FORMTEXT BORING PERMIT PART I GENERAL SUMMARY This section outlines the boring permit requirements that all persons shall meet.


Comments (not logged in)