serc facility connection requirement guidelines rev 6 pdf
Size: 97 KB
Pages: 11
Date: 2011-11-09
Related Documents
Size: 127 KB
Pages: 12
Date: 2012-12-01
SERC Guideline Facility Connection Requirements NERC Reliability Standard FAC-001.
Size: 162 KB
Pages: 12
Date: 2013-01-04
DRAFT SERC Guideline F acility Connection Requirements NERC Reliability Standard FAC-001.
Size: 166 KB
Pages: 12
Date: 2013-01-04
DRAFT SERC Guideline F acility Connection Requirements NERC Reliability Standard FAC-001.
Size: 52 KB
Pages: 4
Date: 2011-11-22
SERC Guideline Power System Stabilizer.
Size: 327 KB
Pages: 38
Date: 2012-08-14
9 /01 /2010 VELCO Facility Connection Requirements, Rev. 1 1 Facility Connection Requirements Rev. 0 April 6, 2009 Rev.
Size: 568 KB
Pages: 22
Date: 2012-06-25
12/05/2011 VELCO Facility Connection Requirements, Rev. 2 1 Facility Connection Requirements.
Size: 327 KB
Pages: 38
Date: 2011-10-27
9 /01 /2010 VELCO Facility Connection Requirements, Rev. 1 1 Facility Connection Requirements Rev. 0 April 6, 2009 Rev.
Size: 216 KB
Pages: 14
Date: 2013-04-02
Size: 133 KB
Pages: 38
Date: 2013-02-25
Business Practice FACILITY CONNECTION REQUIREMENTS FCR Effective Date: 12/17/2012 Version4 This document is published at http ://www. oasis. oati.
Size: 296 KB
Pages: n/a
Date: 2011-04-02
Size: 200 KB
Pages: 19
Date: 2011-04-01
NINESTAR CONNECT FACILITIES CONNECTION REQUIREMENTS Adopted: April2009 Amended: 2 CONTENTS A. GENERAL 1. Introduction 2. Application and Modifications 3. Confidentiality 4. Agreement 5. Adherence.
Size: 1016 KB
Pages: n/a
Date: 2011-04-01
FACILITY CONNECTION REQUIREMENTS Georgia Transmission Corporation Date Version Number Individual Making Edits Reason / Comments 03/24/2005 1 FCR Document.
Size: 191 KB
Pages: n/a
Date: 2011-03-31
Size: 280 KB
Pages: 51
Date: 2011-03-30
FORTISBC FACILITY CONNECTION REQUIREMENTS Revision History Date Revision Description By Approved 01-Feb -10 R0 Issued for Review M. Sidiropoulos Paul Chernikhowsky.
Size: 758 KB
Pages: n/a
Date: 2011-02-02
August 21, 2008 REVISIONS revision Number date reason for revision 0 Approved by SERC 1 8/5/01 Include specific generator reactive support.
Size: 214 KB
Pages: 40
Date: 2011-02-01
i Gainesville Regional Utilities Facility Connection Requirements Latest Revision 04/01/09.
Size: 845 KB
Pages: 107
Date: 2010-12-25
Size: 528 KB
Pages: 46
Date: 2011-12-24
FACILITY CONNECTION REQUIREMENTS Owensboro Municipal Utilities.
Size: 266 KB
Pages: 20
Date: 2011-12-24
Size: 264 KB
Pages: 51
Date: 2011-12-19
FORTISBC FACILITY CONNECTION REQUIREMENTS Revision History Date Revision Description By Approved 01-Feb -10 R0 Issued for Review M. Sidiropoulos Paul Chernikhowsky.
Size: 489 KB
Pages: 43
Date: 2011-12-06
FACILITY CONNECTION REQUIREMENTS Lines, Loads and Generation NERC StandardFAC-001 Version History by 14.
Size: 100 KB
Pages: 30
Date: 2011-12-01
City of Tallahassee, Electric Utility Facility Connection Requirements October 2007 Version Date Synopsis Original 10/25/07 Original approval.
Size: 216 KB
Pages: 26
Date: 2011-11-17
-. doc Title Purpose. NERC Date May04,2009Rev3 1. 0 General: FKECh as 0,documented , publishe d andmade available , uponrequest, s transmission facilities. Itspurposeisto ,ensuring.
Size: 160 KB
Pages: 25
Date: 2011-11-17
Size: 86 KB
Pages: 15
Date: 2011-11-14
Lee County Electric Cooperative,Inc. LCEC Bulk Electric Facility Connection Requirements Revision: November 1, 2009.
Size: 88 KB
Pages: 15
Date: 2011-11-08
Lee County Electric Cooperative,Inc. LCEC Bulk Electric Facility Connection Requirements Revision: September 1, 2011.
Size: 232 KB
Pages: n/a
Date: 2011-07-10
Author: SIPC Staff Role: TO Document Origination Date May 16, 2000 Revision Date April 9, 2010 Page 2 of 30 Southern Illinois Power.
Size: 216 KB
Pages: 26
Date: 2011-07-08
-. doc Title Purpose. NERC Date May04,2009Rev3 1. 0 General: FKECh as 0,documented , publishe d andmade available , uponrequest, s transmission facilities. Itspurposeisto ,ensuring.
Size: 95 KB
Pages: n/a
Date: 2011-07-04
FACILITY CONNECTION REQUIREMENTS Version History Version Version Date Action Change Tracking Reviewed by 0 June 14, 2007 Documentation Development.
Size: 48 KB
Pages: 13
Date: 2011-06-04
1 NEXTERA ENERGY RESOURCES Facility Connection Requirements August 16, 2010 2 Revisions Rev. No. Date Description Approver 1 5/24/2010 Original Joe Arasim 2 8/16/2010.
Size: 294 KB
Pages: n/a
Date: 2011-06-04
Size: 120 KB
Pages: 19
Date: 2011-04-13
FACILITY CONNECTION REQUIREMENTS DOCUMENT TECHNICAL REQUIREMENTS FOR INTERCONNECTION TO THE CITY OF ABBEVILLE, LA TRANSMISSION SYSTEM Initial Issue July 20, 2010.
Size: 349 KB
Pages: 37
Date: 2011-04-11
TECHNICAL REQUIREMENTS FOR INTERCONNECTION TO THE BLACK HILLS CORPORATION TRANSMISSION SYSTEM Version1. 3 December 7,2010 BHC Transmission Planning Department.
Size: 12.5 MB
Pages: 20
Date: 2012-10-22
Size: 8.7 MB
Pages: n/a
Date: 2012-10-22
Size: 8.7 MB
Pages: n/a
Date: 2012-08-20
Size: 372 KB
Pages: n/a
Date: 2012-08-20
ǣ Ƭ i RevisionLog Version Action 0 March 22, 2004 Initial Issue 1 April 26, 2007 Revised to demonstrate.
Size: 139 KB
Pages: n/a
Date: 2012-04-14
PGP FAC-001Page1of 23 Title. NERCStandard FAC-001-0 DeptAssigned 53 Dept s Affected 50,53,56,57 EffectiveDate ReviewPeriod AsRequired PREFACE-. andtheequipment. whichrequires. www. nerc. com/standards.
Size: 71 KB
Pages: 13
Date: 2012-03-05
TRANSMISSION SERVICES FACILITY CONNECTION REQUIREMENTS Version History Version Version Date Action Change Tracking Reviewedby 0 June 14, 2007.
Size: 349 KB
Pages: 37
Date: 2012-02-09
TECHNICAL REQUIREMENTS FOR INTERCONNECTION TO THE BLACK HILLS CORPORATION TRANSMISSION SYSTEM Version1. 3 December 7,2010 BHC Transmission Planning Department.
Size: 192 KB
Pages: 47
Date: 2012-01-25
Version Number: 5. 0 Page1 ENGINEERING POLICY 305 - FACILITIES CONNECTION REQUIREMENTS APPLICABLE STANDARD S : NERC FAC-001-0 DOCUMENT OWNER: TOM KING APPROVEDBY:.
Size: 160 KB
Pages: 25
Date: 2011-11-02
Size: 528 KB
Pages: 46
Date: 2011-10-30
FACILITY CONNECTION REQUIREMENTS Owensboro Municipal Utilities.
Size: 200 KB
Pages: 19
Date: 2011-10-30
NINESTAR CONNECT FACILITIES CONNECTION REQUIREMENTS Adopted: April2009 Amended: 2 CONTENTS A. GENERAL 1. Introduction 2. Application and Modifications 3. Confidentiality 4. Agreement 5. Adherence.
Size: 296 KB
Pages: n/a
Date: 2011-10-27
Size: 43 KB
Pages: 8
Date: 2011-08-27
ENTERGY FACILITY CONNECTION REQUIREMENTS March 2007 Revision Date: October 24,2008Rev ision Date: October 24,2008 2 TABLE OF CONTENTS1.
Size: 414 KB
Pages: 40
Date: 2011-08-24
TECHNICAL REQUIREMENTS FOR INTERCONNECTION TO THE BLACK HILLS POWER TRANSMISSION SYSTEM Version1. 2 May 28,2009 Transmission Planning Department.


Comments (not logged in)