Final Scoping Report pdf
Size: 11 MB
Pages: 114
Date: 2011-11-18
Related Documents
Size: 865 KB
Pages: n/a
Date: 2012-11-03
BARKOMOTIVE PTY LTD PROPOSED RORQUAL ESTATE DEVELOPMENT, UMDONI MUNICIPALITY REF. NO: DC21/0005/2011 FINAL SCOPING REPORT Contents Page 1 DETAILS OF THE ENVIRONMENTAL ASSESSMENT.
Size: 9.3 MB
Pages: 171
Date: 2011-06-15
ESKOM DISTRIBUTION Mookodi Integration Project Final Scoping Report DEA Reference 12/12/20/1929 Issue Date: 02 December 2010 Revision No. : 2 Project.
Size: 11 MB
Pages: 114
Date: 2011-11-18
ANGLO AMERICAN INYOSICOAL Report Name: Report Status: 00 Report Date: February2011 Report Number: S0403/SR01 Prepared by: Marline Medallie,.
Size: 6.4 MB
Pages: n/a
Date: 2011-10-29
TThhee 776655kkVV TThheettaa ppoowweerr lliinnee ffrroomm EErrmmeelloo ttoo DEA REF NO: 12/12/20/2029 EEsskkoomm FFIINNAALL SSCCOOPPIINNGG RREEPPOORRTT January 2011 Scoping.
Size: 1.8 MB
Pages: 83
Date: 2012-03-17
Size: 1.3 MB
Pages: n/a
Date: 2013-01-06
Final IIMMPPAACCTT NNEEWW 776655//440000 kkVV KKAAPPPPAA WWEESSTTEERRNN CCAAPPEE DEAT REF NO: 12/12/20/1085 EEsskkoomm FFIINNAALL SSCCOOPPIINNGG RREEPPOORRTT PPrroojjeecctt 1100663366.
Size: 2.3 MB
Pages: n/a
Date: 2012-01-08
ZITHOLELE CONSULTING ooff tthhee AAsshh aatt CCaammddeenn PPoowweerr SSttaattiioonn DEA REF NO: 12/12/20/2300 EEsskkoomm FFIINNAALL SSCCOOPPIINNGG RREEPPOORRTT 1122667700 September.
Size: 542 KB
Pages: 51
Date: 2013-01-19
Environamics: Hanskopfontein Final Scoping Report i PROJECT DETAIL COPYRIGHT RESERVED This technical report has been produced for reproduced in any manner.
Size: 261 KB
Pages: 4
Date: 2011-02-08
Appendix C Notification toIeAPs of Acceptance of Final Scoping Report and Plan of Study for EI~1.pdf
APPENDIXC Notification to Interested and Affected Parties of acceptance of Final Scoping Report and Plan of Study for EIA.
Size: 2.3 MB
Pages: n/a
Date: 2011-01-19
Final Scoping Report, September2009 Title: EIA Study for Strategic Expansion of the Walvis Bay Container Terminal. Date: September 2009 CSIR Reportno:.
Size: 10 MB
Pages: 262
Date: 2012-10-22
Deepening, Lengthening and Widening of Berths 203 to205 Final Scoping Report i 2012 P. O. BOX1673 SUNNINGHILL 2157 147 Bra m Fischer Drive FERNDALE 2194.
Size: 89 KB
Pages: n/a
Date: 2012-10-22
Baagi Environmental Consultancy CC Final Scoping report June 2009 24 Glockner -Kookfontein Project 7. Plan of Study for Environmental Impact Assessmen.
Size: 1.4 MB
Pages: n/a
Date: 2012-06-29
ESKOM TRANSMISSION PROPOSED ARIADNE - EROS400 KV/132 K V MULTI - CIRCUIT FINAL SCOPING REPORT 34 The surveying team then ma kes the first basic.
Size: 5.3 MB
Pages: 166
Date: 2012-06-29
Final Scoping Report Construction of the DAS Steel Mini Steel F oundry Environmental Authorisation Volume1 DAEARD Reference: DM/0053/2011 17 May 2012.
Size: 104 KB
Pages: n/a
Date: 2012-05-28
Baagi Environmental Consultancy CC Final Scoping report June 2009 11 Glockner -Kookfontein Project 3. Project Overview 3. 1. Study Area The study.
Size: 1.2 MB
Pages: 86
Date: 2011-10-21
Report No: 4689/402633 Namibias Priority Generation Project at Paratus Power Station, WalvisBay FINAL SCOPING REPORT AUGUST 2008 LEAD.
Size: 2.5 MB
Pages: 82
Date: 2012-12-29
CANYON SPRINGS INVESTMENTS 82 PTY LTD PROPOSED CANYON SPRINGS COAL MINE FINAL SCOPING REPORT FOR ACTIVITIES LISTED IN TERMS OF THE NATIONAL ENVIRONMENTAL.
Size: 4.5 MB
Pages: 193
Date: 2012-12-11
PROPOSED ESTABLISHME NTOF AN OPEN CAST PGMMINE ON THE FARM VOLSPRUIT 3 26 KR D 294KR, MOKOPANE DISTRICT, L IMPOPO PROVINCE FINAL SCOPING REPORT.
Size: 1.1 MB
Pages: 68
Date: 2012-07-10
Anglo American Limited - Mogalakwena Mine Scoping Report for the Proposed Waste Site Report Prepared for Anglo American Ltd Mogalakwena Mine.
Size: 2.3 MB
Pages: 96
Date: 2013-05-30
Delivering sustainable solutions in a more competitive world Final Scoping Report Proposed 90 MW Drennan Photovoltaic PV Power Facility, Eastern Cape.
Size: 234 KB
Pages: 39
Date: 2011-10-22
ENVIRONMENTAL IMPACT ASSESSMENT FINAL SCOPING REPORT 2010 WORLD CUP: PROPOSED RE-DEVELOPMENT OF GREENPOINT STADIUM AND ASSOCIATED INFRASTRUCTURE PREPARED.
Size: 3.9 MB
Pages: 132
Date: 2011-08-25
SOUTH AFRICAN MAINSTREAM RENEWABLE POWER PTY LTD Constructionof CPV/PV Solar Power Plant in Loeriesfontein, Northern Cape Province, South Africa.
Size: 234 KB
Pages: 39
Date: 2011-06-05
ENVIRONMENTAL IMPACT ASSESSMENT FINAL SCOPING REPORT 2010 WORLD CUP: PROPOSED RE-DEVELOPMENT OF GREENPOINT STADIUM AND ASSOCIATED INFRASTRUCTURE PREPARED.
Size: 1.9 MB
Pages: n/a
Date: 2011-05-30
ZITHOLELE CONSULTING TTuuttuukkaa WWaassttee SSiittee:: ooff tthhee GGeenneerraall WWaassttee SSiittee aanndd aatt tthhee TTuuttuukkaa PPoowweerr SSttaattiioonn.
Size: 5.9 MB
Pages: n/a
Date: 2011-04-15
Strategic Environmental Assessment SEA of Offshor e Wind and Marine Renewable Energy in Northern Ireland Final Scoping Report Department of Enterprise, Trade.
Size: 1.4 MB
Pages: n/a
Date: 2011-04-14
TThhee UUppggrraaddee ooff tthhee TTaabboorr aanndd tthhee ooff tthhee 113322 kkVV ppoowweerr lliinnee. DEA REF NO: 12/12/20/1776 EEsskkoomm FFIINNAALL.
Size: 261 KB
Pages: 4
Date: 2010-12-02
APPENDIXC Notification to Interested and Affected Parties of acceptance of Final Scoping Report and Plan of Study for EIA.
Size: 267 KB
Pages: 6
Date: 2010-11-12
APPENDIXB DEAT acceptance of Final Scoping Report and Plan of Study for EIA.
Size: 267 KB
Pages: 6
Date: 2010-11-12
APPENDIXB DEAT acceptance of Final Scoping Report and Plan of Study for EIA.
Size: 89 KB
Pages: 16
Date: 2011-10-20
Scoping Summary Report Oklahoma Land Conveyance, Lake Texoma, OK andTX NEPA Scoping Open House 22 September 2009 Hosted.
Size: 527 KB
Pages: 74
Date: 2011-04-12
Final Scoping Summary Report LCLA ProjectEIS FINAL SCOPING SUMMARY REPORT Lincoln County Land Act Groundwater Development and Utility.
Size: 6.2 MB
Pages: 16
Date: 2012-04-08
Transnet Limited Phase 2 Expansion: Port of Saldanha Environmental Scoping Report Prepared by the PDNA SRK Joint Venture Appendix A12 NOTES OF SCOPING.
Size: 3.1 MB
Pages: n/a
Date: 2011-12-24
Somerset Minerals and Waste Development Framework Sustainability Appraisal Strategic Environmental Assessment Scoping Report February 2011 Somerset County.
Size: 373 KB
Pages: 26
Date: 2012-01-10
Final Key Issue Scoping Report October 2008 Docdm-348042.
Size: 2.7 MB
Pages: 54
Date: 2012-10-22
BALLITO PAGE 1 Guy Nicolson Consulting cc: July2012 FINAL ENVIRONMENTAL SCOPING REPORT ON THE PROPOSED GREENLANDS TOWN CENTRE AT BALLITO ON REMAINDER OF PORTION.
Size: 2.2 MB
Pages: 108
Date: 2012-07-21
Final Environmental Scoping Report Proposed Developmentof a Shell Petrol Filling Station, 7/9 Link Road, Waterfall, Durban, KwaZulu - Natal.
Size: 1.3 MB
Pages: 178
Date: 2011-06-08
Scoping Report For An Environmental Assessment Of The NZ Emissions Trading Scheme And Closely Related Measures Cawthron Report No. 1436 April 2008 - Final.
Size: 58 KB
Pages: 12
Date: 2011-05-28
Salton Sea SCH Project 1 August 12, 2010 Scoping Report Salton Sea Species Conservation Habitat Scoping Report Palm Desert University of California.
Size: 414 KB
Pages: n/a
Date: 2012-05-26
ENVIRONMENTAL IMPACT ASSESSMENT EIA FOR THE PROPOSED MAKHATHINI SUGAR CANE PROJECT MASCP , EIA REF: 12/12/20/1658 , KWAZULU - NATAL PROVINCE FINAL SCOPING.
Size: 259 KB
Pages: 35
Date: 2011-01-30
South Staffordshire Council Housing Land Availability Assessment Scoping Report January 2007 Entec UK Limited.
Size: 3.7 MB
Pages: n/a
Date: 2012-07-04
Scoping Report Leicestershire Waste Development Framework Sustainability Appraisal I ncorporating Strategic Environmental Assessment March 2005 LEICESTERSHIRE WASTE.
Size: 1.7 MB
Pages: 80
Date: 2012-02-03
Scoping Report East Devon District Council: University of Exeter Science Park Supplementary Planning Document Sustainability Appraisal / Strategic.
Size: 1.7 MB
Pages: 6
Date: 2012-01-11
Scoping Report East Devon District Council: University of Exeter Science Park Supplementary Planning Document Sustainability Appraisal / Strategic.
Size: 639 KB
Pages: 125
Date: 2012-01-04
Lower Tidal River Arun Strategy SEA Scoping Report November 2011.
Size: 3.7 MB
Pages: n/a
Date: 2011-12-28
Sustainability Appraisal SA Scoping Report for the Southside and Meadows Area Action Plan Quick guide to the Local Development Framework Sustainability Appraisal.
Size: 1 MB
Pages: 82
Date: 2011-12-11
Lewisham local development framework Sustainability appraisal incorporating strategic environmental assessment Scoping Report Site allocations development plan.
Size: 1.5 MB
Pages: 138
Date: 2011-12-08
Size: 319 KB
Pages: n/a
Date: 2011-11-17
Size: 111 KB
Pages: n/a
Date: 2013-01-18
Scoping Report – for consultation CIMS Issue 167 – Qualification in Post-tensioning Overview The Post-tensioning Institute of Australia PTIA lodged an issue with CPSISC.


Comments (not logged in)