Addendum 1 for Bid Package 1 pdf
Size: 66 KB
Pages: 1
Date: 2011-11-15
Related Documents
Size: 3 MB
Pages: 36
Date: 2012-06-15
Size: 370 KB
Pages: 12
Date: 2012-07-10
Size: 4 MB
Pages: 86
Date: 2011-06-11
LITTLE PATUXENT WRP, ADDITION NO. 7 1 of9 BID FORM CAPTIAL PROJECT NO. S-6245. E CONTRACT NO. 60-4598 LITTLE PATUXENT WRP, ADDITION NO. 7 ENR AND EXPANSION IMPROVEMENTS.
Size: 21 KB
Pages: 3
Date: 2012-05-13
6/5/2009 LITTLE PATUXENT WRP 1 of3 ADDITION 7, ENR EXPANS ION IMPROVEMENTS BID PACKAGE 16 CONCRETE TANK REPAIRS - SCOPE OF WORK The shall provide all labor, materials,.
Size: 1.5 MB
Pages: n/a
Date: 2011-11-26
Size: 3.7 MB
Pages: 16
Date: 2012-08-20
Size: n/a
Pages: 2
Date: 2012-10-22
Size: n/a
Pages: 14
Date: 2012-10-22
1. A Pre-Bid Walk was held on July 18, 2012. The agenda and sign-in sheets are included in this Addendum as an attachment. 2. Bid Date and Time for Bid Package 114 as listed.
Size: n/a
Pages: 5
Date: 2012-08-18
ADDENDUM No. 02 Page 1 of 2 July 31, 2012 Post Point Wastewater Treatmen t Plant Improvements Owner: City of Bell ingham Engineer: Carollo.
Size: 347 KB
Pages: 17
Date: 2012-02-22
1 of 5 BP General Contractor Item Total 1 General Conditions 2 Demolition 3 Concrete 4 Masonry 5 Metals 6 Woods and Plastics 7 Water and Damp Proofing 8 Roofing.
Size: 1.7 MB
Pages: 5
Date: 2013-03-04
this addendum in their bids. CLARIFICATIONS:.
Size: 139 KB
Pages: 3
Date: 2012-11-02
Hashemite Kingdom of Jordan Ministry of Water Irrigation Water Authority of Jordan Tender NO 12/2012/special works AddendumNo. 2 Request for of Contractors Project:.
Size: 635 KB
Pages: 88
Date: 2012-11-10
NOTICE TO BIDDERS, PROPOSAL, CONTRACT AND SPECIAL PROVISIONS FOR CONSTRUCTION LAND MOBILE RADIO LMR COMMUNICATIONS SITES BID PACKAGE 2 SEALED BIDSDUE by 2:00PM.
Size: 70 KB
Pages: n/a
Date: 2011-12-24
Project Summary Bid Package Info Project: Deschutes County Sheriff’s Office Tenant Improvement Project : 1010 Date: August 13, 2010.
Size: 927 KB
Pages: 185
Date: 2011-12-04
VCBO ARCHITECTURE 524 SOUTH 600EAST SALT LAKECITY UTAH 84102 TEL 801 5758800 F AX 801 5319850 DIVISION S 0 THRU 14 MARCH 30,2009 PROJECTMANUAL OWNER.
Size: 52 KB
Pages: 1
Date: 2011-09-04
Performance! P742 BEQ Naval Base Coronado BID PACKAGE SCHEDULE UPDATE: 07/11/11 Subsys. Pre-Qual Bid Package Award No. Deadline Issue Date.
Size: 2.1 MB
Pages: 40
Date: 2013-04-24
Size: 8 MB
Pages: 241
Date: 2013-04-23
SPECIFICATION NARRATIVE TABLE OF CONTENTS Page 1 of 2 Woolleys Classic Suites Aurora, Colorado October 5, 2012 November 2, 2012 Woolleys Classic.
Size: 8.5 MB
Pages: 287
Date: 2013-04-21
SPECIFICATION NARRATIVE TABLE OF CONTENTS Page 1 of 3 Woolleys Classic Suites Aurora, Colorado October 5, 2012, November 2, 2012 November 29, 2012.
Size: 1.1 MB
Pages: n/a
Date: 2013-04-16
Size: 195 KB
Pages: 24
Date: 2013-04-01
South Village of Zionsville PhaseI Subcontractor Name:_____ Proposal _____ BID DATE: Tuesday, March5 Proposals: PROPOSAL NO. 6110 FRAMING MATERIAL.
Size: 208 KB
Pages: 2
Date: 2013-03-02
Size: 941 KB
Pages: n/a
Date: 2013-01-30
Bid due time: 10:00 a. m. Bid due location: MAIN CAMPUS- Office of Business and Auxiliary Services A-Building Room A3102 Bids will be opened publicly.
Size: 2.3 MB
Pages: 8
Date: 2012-11-07
Size: 3.8 MB
Pages: 30
Date: 2012-11-02
Prepared for The KPA Group GEOTECHNICAL INVESTIGATION PROPOSED EBRCSA COMMUNICATION EQUIPMENT SITE WALNUT CREEK BART 2576 CAMINO DIABLO WALNUT.
Size: 107 KB
Pages: 1
Date: 2012-01-14
Bid Date: Tuesday, May 4,2010 Page 1of 1 LAX B RADLEY WEST GATES APRIL 20, 2010 POST BID ADDENDUM N UMBER 01 Bidders must acknowledge receipt.
Size: 34 KB
Pages: 4
Date: 2012-12-08
San Diego Community College District April 19, 2010 Vocational Technology Center and Parking Structure R S Job No. 50016-0 San Diego City College Page.
Size: 258 KB
Pages: 37
Date: 2010-11-12
BID NO. 10252 BOARD OF SUPERVISORS COUNTY OF MONTEREY SALINAS, CALIFORNIA GENERAL PROVISIONS SPECIAL PROVISIONS AND BIDFOR Island Group Area Building.
Size: 245 KB
Pages: n/a
Date: 2011-04-23
1 Addendum 1 10/16/2009 Clarifications and NEW Supplemental BidForm Supplemental 1 - Provide 100 pair telephone cable from Communica tion Pedestals P1 to P2. Leave sufficient.
Size: 258 KB
Pages: 37
Date: 2012-02-12
BID NO. 10252 BOARD OF SUPERVISORS COUNTY OF MONTEREY SALINAS, CALIFORNIA GENERAL PROVISIONS SPECIAL PROVISIONS AND BIDFOR Island Group Area Building.
Size: 42 KB
Pages: n/a
Date: 2011-12-29
July 28, 2008 Addendum Number One To Request for Quotation Boiler Plant Implementation - Bid Package 8 July 22, 2008 Thank you for attending the University’s pre-bid.
Size: 33 KB
Pages: 4
Date: 2011-12-04
REVISEDBID PACKAGE 15C HVAC SCOPE OF SUBCONTRACTOR S WORK a. Subcontractor, as an independent contractor employed by Contractor, agrees to provide and to furnish all labor, materials,.
Size: 25 KB
Pages: n/a
Date: 2011-11-10
2 600 Amp Feeder Electric Fire Alarm Fire Alarm Generator Control Controls Telephone Telephone Intercom Spare - Blank Note: Handhole.
Size: 59 KB
Pages: 3
Date: 2011-11-08
1 Earthwork / Site Grading 2 Soil Remediation 3 Concrete paving including concrete curbs 3a Value of Rock base Material Only 4 Side.
Size: 2.7 MB
Pages: n/a
Date: 2011-11-08
1 Scope of Work Addendum 1 Migeon Kitchen Renovations BI-DDS-539 Robert Klingner, Plant Facilities Engineer Department of Developmental Services West.
Size: 265 KB
Pages: n/a
Date: 2011-11-08
1 Torrington Main Switchgear/ASCO Switch Maintenance Project. Questions Answers March 9, 2010 ! ! ! ! , -. / 0 1 1 Primary or secondary injection on the Main break er Just.
Size: 323 KB
Pages: 44
Date: 2011-10-31
Revised clarification: RE: BI-DDS 530 Cottage 7 VCT Installation Second floor rooms 206, 214,218,220 222, flooring material will be removed by abatement.
Size: 226 KB
Pages: n/a
Date: 2011-10-29
1 Addendum 1 Q A 1/2/08 ETGC DUCT CLEANING BID - BI-DDS-EPPA. 2 DEPARTMENT OF DEVELOPMENTAL SERVICES West Region INVITATION TOBID · PROJECT and PROJECT TITLE.
Size: 28 KB
Pages: 3
Date: 2011-08-27
Purchasing Department Detroit, Michigan 48202 313 577-3734 Finance Facilities Management FAX 313 577-3747 August 12, 2008 Addendum Number Two To Request for Quotation.
Size: 320 KB
Pages: n/a
Date: 2011-07-26
1 BI-DDS-529 Door Systems NEW BID OPENING DATE 11/21/2008 at 10 am Answers to Questions 11/10/2008 Narowski, John A Site for storage trailer will be available.


Comments (not logged in)