Result for: 49cfr192
|
|
Recommend this on Google |
46 49 CFR Ch. I 10103 Edition §192. 179 installation as required by subpart J of this part. 35 FR 13257, Aug. 19, 1970, as amended by Amdt. 19258, 53 FR 1635, Jan. 21, 1988; Amdt.
edocket.access.gpo.gov/cfr_2003/octqtr/pdf/49cfr192.177.pdf
64 49 CFR Ch. I 101 02 Edition § 192. 457 be cathodically protected in accord- ance with paragraph a 2 of this sec- tion. e Aluminum may not be installed in a buried or submerged pipeline.
edocket.access.gpo.gov/cfr_2002/octqtr/pdf/49cfr192.455.pdf
53 Research and Special Programs Administration, DOT §192. 229 practicable to the point of takeoff. Blowdown valves must be installed where necessary. 3 Brass or copper.
edocket.access.gpo.gov/cfr_2004/octqtr/pdf/49cfr192.227.pdf
85 Research and Special Programs Administration, DOT §192. 706 which the odor becomes readily detect- able. Operators of master meter sys- tems.
edocket.access.gpo.gov/cfr_2004/octqtr/pdf/49cfr192.705.pdf
32 49 CFR Ch. I 10104 Edition §192. 5 Offshore means beyond the line of or- dinary low water along that portion of the coast of the United States that.
edocket.access.gpo.gov/cfr_2004/octqtr/pdf/49cfr192.3.pdf
89 Research and Special Programs Administration, DOT§192. 753 operated at intervals not exceeding 15 months, but at least once each cal- endar year. Amdt.
edocket.access.gpo.gov/cfr_2003/octqtr/pdf/49cfr192.749.pdf
69 Research and Special Programs Administration, DOT §192. 465 §192. 463External corrosion control: Cathodic protection. a Each cathodic protection system required.
edocket.access.gpo.gov/cfr_2004/octqtr/pdf/49cfr192.465.pdf
88 49 CFR Ch. I 10103 Edition §192. 741 d Properly installed and protected from dirt, liquids, or other conditions that might prevent proper operation.
edocket.access.gpo.gov/cfr_2003/octqtr/pdf/49cfr192.741.pdf
40 49 CFR Ch. I 101 02 Edition § 192. 145 requirements for the following as an edition of that document currently or previously listed in appendix A: 1 Pressure testing; 2 Materials; and 3 ...
edocket.access.gpo.gov/cfr_2002/octqtr/pdf/49cfr192.145.pdf
58 49 CFR Ch. I 101 02 Edition § 192. 327 this section, each plastic transmission line or main must be installed with suf- ficient clearance, or must.
edocket.access.gpo.gov/cfr_2002/octqtr/pdf/49cfr192.327.pdf
76 49 CFR Ch. I 101 02 Edition § 192. 612 § 192. 612Underwater inspection and re-burial of pipelines in the Gulf of Mexico and its inlets. a Each operator shall, in accord- ance with this.
edocket.access.gpo.gov/cfr_2002/octqtr/pdf/49cfr192.612.pdf
Twitter