Result for: 49cfr192

about result: 305

Sort by: Date    Size    Pages    Reset


Recommend this on Google

49cfr192.612.pdf  

49cfr192.612.pdf

edocket.access.gpo.gov/cfr_2010/octqtr/pdf/49cfr192.612.pdf

  0 Size: 40 KB Pages: 2 Date: 2012-03-11
 
 
49cfr192.10.pdf  

49cfr192.10.pdf

edocket.access.gpo.gov/cfr_2004/octqtr/pdf/49cfr192.10.pdf

  0 Size: 28 KB Pages: 1 Date: 2012-03-06
 
 
49cfr192.513.pdf  

49cfr192.513.pdf

edocket.access.gpo.gov/cfr_2007/octqtr/pdf/49cfr192.513.pdf

  0 Size: 54 KB Pages: 1 Date: 2012-03-02
 
 
49cfr192.177.pdf  

49cfr192.177.pdf

46 49 CFR Ch. I 10–1–03 Edition §192. 179 installation as required by subpart J of this part. 35 FR 13257, Aug. 19, 1970, as amended by Amdt. 192–58, 53 FR 1635, Jan. 21, 1988; Amdt.

edocket.access.gpo.gov/cfr_2003/octqtr/pdf/49cfr192.177.pdf

  0 Size: 34 KB Pages: 2 Date: 2012-03-01
 
 
49cfr192.199.pdf  

49cfr192.199.pdf

edocket.access.gpo.gov/cfr_2006/octqtr/pdf/49cfr192.199.pdf

  0 Size: 25 KB Pages: 2 Date: 2012-02-27
 
 
49cfr192.511.pdf  

49cfr192.511.pdf

edocket.access.gpo.gov/cfr_2007/octqtr/pdf/49cfr192.511.pdf

  0 Size: 57 KB Pages: 2 Date: 2012-02-26
 
 
49cfr192.903.pdf  

49cfr192.903.pdf

edocket.access.gpo.gov/cfr_2008/octqtr/pdf/49cfr192.903.pdf

  0 Size: 56 KB Pages: 2 Date: 2012-02-24
 
 
49cfr192.455.pdf  

49cfr192.455.pdf

64 49 CFR Ch. I 10–1 – 02 Edition § 192. 457 be cathodically protected in accord- ance with paragraph a 2 of this sec- tion. e Aluminum may not be installed in a buried or submerged pipeline.

edocket.access.gpo.gov/cfr_2002/octqtr/pdf/49cfr192.455.pdf

  0 Size: 37 KB Pages: 2 Date: 2012-02-20
 
 
49cfr192.227.pdf  

49cfr192.227.pdf

53 Research and Special Programs Administration, DOT §192. 229 practicable to the point of takeoff. Blowdown valves must be installed where necessary. 3 Brass or copper.

edocket.access.gpo.gov/cfr_2004/octqtr/pdf/49cfr192.227.pdf

  0 Size: 32 KB Pages: 1 Date: 2012-02-19
 
 
49cfr192.925.pdf  

49cfr192.925.pdf

edocket.access.gpo.gov/cfr_2005/octqtr/pdf/49cfr192.925.pdf

  0 Size: 55 KB Pages: 2 Date: 2012-02-19
 
 
49cfr192.939.pdf  

49cfr192.939.pdf

edocket.access.gpo.gov/cfr_2008/octqtr/pdf/49cfr192.939.pdf

  0 Size: 56 KB Pages: 3 Date: 2012-02-18
 
 
49cfr192.705.pdf  

49cfr192.705.pdf

85 Research and Special Programs Administration, DOT §192. 706 which the odor becomes readily detect- able. Operators of master meter sys- tems.

edocket.access.gpo.gov/cfr_2004/octqtr/pdf/49cfr192.705.pdf

  0 Size: 30 KB Pages: 1 Date: 2012-02-12
 
 
49cfr192.903.pdf  

49cfr192.903.pdf

edocket.access.gpo.gov/cfr_2010/octqtr/pdf/49cfr192.903.pdf

  0 Size: 55 KB Pages: 2 Date: 2012-02-09
 
 
49cfr192.3.pdf  

49cfr192.3.pdf

32 49 CFR Ch. I 10–1–04 Edition §192. 5 Offshore means beyond the line of or- dinary low water along that portion of the coast of the United States that.

edocket.access.gpo.gov/cfr_2004/octqtr/pdf/49cfr192.3.pdf

  0 Size: 35 KB Pages: 2 Date: 2012-02-07
 
 
49cfr192.749.pdf  

49cfr192.749.pdf

89 Research and Special Programs Administration, DOT§192. 753 operated at intervals not exceeding 15 months, but at least once each cal- endar year. Amdt.

edocket.access.gpo.gov/cfr_2003/octqtr/pdf/49cfr192.749.pdf

  0 Size: 28 KB Pages: 1 Date: 2012-02-07
 
 
49cfr192.931.pdf  

49cfr192.931.pdf

edocket.access.gpo.gov/cfr_2010/octqtr/pdf/49cfr192.931.pdf

  0 Size: 52 KB Pages: 2 Date: 2012-02-06
 
 
49cfr192.115.pdf  

49cfr192.115.pdf

edocket.access.gpo.gov/cfr_2005/octqtr/pdf/49cfr192.115.pdf

  0 Size: 47 KB Pages: 1 Date: 2012-02-06
 
 
49cfr192.465.pdf  

49cfr192.465.pdf

69 Research and Special Programs Administration, DOT §192. 465 §192. 463External corrosion control: Cathodic protection. a Each cathodic protection system required.

edocket.access.gpo.gov/cfr_2004/octqtr/pdf/49cfr192.465.pdf

  0 Size: 29 KB Pages: 1 Date: 2012-02-06
 
 
49cfr192.741.pdf  

49cfr192.741.pdf

88 49 CFR Ch. I 10–1–03 Edition §192. 741 d Properly installed and protected from dirt, liquids, or other conditions that might prevent proper operation.

edocket.access.gpo.gov/cfr_2003/octqtr/pdf/49cfr192.741.pdf

  0 Size: 28 KB Pages: 1 Date: 2012-02-06
 
 
49cfr192.145.pdf  

49cfr192.145.pdf

40 49 CFR Ch. I 10–1 – 02 Edition § 192. 145 requirements for the following as an edition of that document currently or previously listed in appendix A: 1 Pressure testing; 2 Materials; and 3 ...

edocket.access.gpo.gov/cfr_2002/octqtr/pdf/49cfr192.145.pdf

  0 Size: 34 KB Pages: 1 Date: 2012-02-03
 
 
49cfr192.327.pdf  

49cfr192.327.pdf

58 49 CFR Ch. I 10–1 – 02 Edition § 192. 327 this section, each plastic transmission line or main must be installed with suf- ficient clearance, or must.

edocket.access.gpo.gov/cfr_2002/octqtr/pdf/49cfr192.327.pdf

  0 Size: 34 KB Pages: 1 Date: 2012-01-31
 
 
49cfr192.612.pdf  

49cfr192.612.pdf

76 49 CFR Ch. I 10–1 – 02 Edition § 192. 612 § 192. 612Underwater inspection and re-burial of pipelines in the Gulf of Mexico and its inlets. a Each operator shall, in accord- ance with this.

edocket.access.gpo.gov/cfr_2002/octqtr/pdf/49cfr192.612.pdf

  0 Size: 34 KB Pages: 1 Date: 2012-01-31
 
 
49cfr192.163.pdf  

49cfr192.163.pdf

edocket.access.gpo.gov/cfr_2007/octqtr/pdf/49cfr192.163.pdf

  0 Size: 56 KB Pages: 2 Date: 2012-01-28
 
 
49cfr192.323.pdf  

49cfr192.323.pdf

edocket.access.gpo.gov/cfr_2006/octqtr/pdf/49cfr192.323.pdf

  0 Size: 22 KB Pages: 1 Date: 2012-01-28
 
 
49cfr192.359.pdf  

49cfr192.359.pdf

edocket.access.gpo.gov/cfr_2005/octqtr/pdf/49cfr192.359.pdf

  0 Size: 52 KB Pages: 2 Date: 2012-01-24
 
 
 

Authorisation