NERC is conducting a recirculation ballot of the NERC Standard Processes Manual, from November 9-13, 2010. The initial ballot achieved an 81. 61 quorum.
Size: 45 KB
Pages: n/a
Date: 2011-07-24
NERC is conducting a ballot of standard FAC-013-2 – Planning Transfer Capability Project 2010-10 from October 20 to November 3, 2010. Members of the Project.
Size: 56 KB
Pages: n/a
Date: 2011-11-21
Being Balloted April 8-17, 2009 From April 8–17, 2009, NERC is conducting a ballot of the interpretation of PRC-005-1, Requirement 1, as requested.
Size: 35 KB
Pages: n/a
Date: 2011-11-06
WECC COMMITTEES WECC SUBCOMMITTEES WECC WORK GROUPS WECC TASK FORCES STANDARDS DISTRIBUTION LIST On May 23, 2011 WECC distributed.
Size: 45 KB
Pages: n/a
Date: 2011-06-10
CIP-006-1a Requirement 4 Being Balloted January 5-14, 2009 NERC is conducting a ballot, from January 5-14, 2009, of the interpretation of CIP-006-1a,.
Size: 42 KB
Pages: n/a
Date: 2011-06-10
The Emergency Operations Planning standard EOP-001-0, Requirement 1 Being Balloted October 4-14, 2010 NERC is conducting a recirculation ballot of the Emergency.
Size: 42 KB
Pages: n/a
Date: 2011-06-10
Generator Operation for Maintaining Network Voltage Schedules standard VAR-002-1a Being Balloted January 6-15, 2009 NERC is conducting a recirculation.
Size: 41 KB
Pages: n/a
Date: 2011-06-09
NERC is conducting a recirculation ballot of Project 2007-01 – Underfrequency Load Shedding, which includes standards EOP-003-2 and PRC-006-1, from October.
Size: 41 KB
Pages: n/a
Date: 2011-06-09
NERC is conducting a successive ballot of the Definition of “Protection System” from October 2-14, 2010. Members of the Project 2007-17 – Protection System.
Size: 42 KB
Pages: n/a
Date: 2011-06-09
NERC is conducting a ballot of standard PRC-006-1 – Underfrequency Load Shedding Project 2007-01 from July 8-17, 2010. If approved, the proposed.
Size: 45 KB
Pages: n/a
Date: 2011-06-04
NERC is conducting a ballot of proposed changes to CIP-002-3 – Cyber Cyber Asset Identification and conforming changes to several other CIP standards from.
Size: 41 KB
Pages: n/a
Date: 2011-04-07
NERC is conducting a recirculation ballot of the interpretation of TOP-002-2a, Requirement 10, from October 6-16, 2010. The initial ballot achieved an 84. 98 quorum and passed.
Size: 44 KB
Pages: n/a
Date: 2012-01-12
NERC is conducting a recirculation ballot of Project 2010-17 – Definition of Bulk Electric System, from November 10-21, 2011. Because of the nature.
Size: 44 KB
Pages: n/a
Date: 2012-01-09
NERC is conducting a second ballot of standard PRC-006-1 – Underfrequency Load Shedding Project 2007-01 from July 24 to August 3, 2010. If approved,.
Size: 41 KB
Pages: n/a
Date: 2011-12-30
NERC is conducting a ballot of standard IRO-006-1 – Transmission Loading Relief from June 23 to July 6, 2010. Members of the Project 2006-08 - Transmission.
Size: 45 KB
Pages: n/a
Date: 2011-12-18
NERC is conducting a non-binding poll of six sets of Violation Severity Levels VSLs , Project 2007-23, from October 27 to November 6, 2010. The VSLs.
Size: 29 KB
Pages: n/a
Date: 2012-11-26
Size: 305 KB
Pages: 44
Date: 2011-05-29
Midwest Reliability Organization Regional Reliability Standards Process Manual Version 4. 5.
Size: 97 KB
Pages: 34
Date: 2011-04-18
Team Draft 1 Draft Midwest Reliability Organization Reliability Standards Process Manual Version 2. 0 Approved by MRO Board of Directors month dd,yyyy.
Size: 308 KB
Pages: 41
Date: 2011-04-05
Midwest Reliability Organization Regional Reliability Standards Process Manual Version 4. 5.
Size: 217 KB
Pages: 37
Date: 2011-04-03
Team Draft 2 Draft Midwest Reliability Organization Reliability Standards Process Manual Version 3. 0 Approved by MRO Board of Directors mm dd,yyyy Insert.
Size: 308 KB
Pages: 39
Date: 2010-11-12
Midwest Reliability Organization Regional Reliability Standards Process Manual Version 3. 0 Approved by MRO BOD mm dd,yyyy Final Draft November 22, 2006.
Size: 102 KB
Pages: 16
Date: 2010-11-12
Region: MRO Commenter Comment Jim Cyrulewski JDRJC Associates Question 1 and 4: ERCOT, MRO, SPP: Unclear in ERCOT Ballo t Body if consultants handled.
Size: 54 KB
Pages: 7
Date: 2012-01-26
Standard Authorization Request Form ID: MRO-0 02-0 Authorized for Posting: Authorizedfor Development: SAR Reque stor Inform ation Name; Tim Noeldner.
Size: 446 KB
Pages: 45
Date: 2012-08-19
Size: 404 KB
Pages: 41
Date: 2012-08-12
Size: 20 KB
Pages: n/a
Date: 2013-01-15
Size: 334 KB
Pages: 5
Date: 2012-11-28
Revisions to Implement SPIG Recommendations.
Size: 49 KB
Pages: n/a
Date: 2011-12-31
Being Balloted January 6-18, 2010 From approximately January 6-16, 2010 NERC is conducting a ballot of The Western Electricity Coordinating.
Size: 214 KB
Pages: 37
Date: 2011-12-30
Team Draft 1 Draft Midwest Reliability Organization Reliability Standards Process Manual Version 3. 0 Approved by MRO Board of Directors mm dd,yyyy Insert.
Size: 575 KB
Pages: 43
Date: 2011-12-17
Size: 398 KB
Pages: 43
Date: 2012-03-19
Size: 44 KB
Pages: n/a
Date: 2011-04-01
Size: 457 KB
Pages: 48
Date: 2010-11-12
MMaannuuaall DDrraafftt JJaannuuaarryy MMaarrcchh 22001100.
Size: 26 KB
Pages: n/a
Date: 2011-12-19
1 BEFORE THE BRITISH COLUMBIA UTILITIES COMMISSION OF THE PROVINCE OF BRITISH COLUMBIA NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION NOTICE OF FILING OF THE NORTH.
Size: 703 KB
Pages: n/a
Date: 2012-08-07
Size: 471 KB
Pages: 43
Date: 2012-07-01
Size: 83 KB
Pages: 23
Date: 2012-06-23
holly. hawkins nerc. net June 21, 2010 TABLE OF CONTENTS I. INTRODUCTION 2 II. NOTICES AND COMMUNICATIONS 3 III. STATEMENT OF BASIS AND PURPOSE OF THE PROPOSED REVISIONS TO THE RELIABILITY.
Size: 83 KB
Pages: 23
Date: 2012-06-22
TABLE OF CONTENTS I. INTRODUCTION 2 II. NOTICES AND COMMUNICATIONS 3 III. STATEMENT OF BASIS AND PURPOSE OF THE PROPOSED REVISIONS TO THE RELIABILITY STANDARDS DEVELOPMENT PROCESS 3 A. Overview of Proposed.
Size: 484 KB
Pages: 43
Date: 2012-03-18
Size: 83 KB
Pages: 23
Date: 2012-03-14
holly. hawkins nerc. net June 21, 2010 TABLE OF CONTENTS I. INTRODUCTION 2 II. NOTICES AND COMMUNICATIONS 3 III. STATEMENT OF BASIS AND PURPOSE OF THE PROPOSED REVISIONS TO THE RELIABILITY.
Size: 83 KB
Pages: 23
Date: 2012-01-24
holly. hawkins nerc. net June 21, 2010 TABLE OF CONTENTS I. INTRODUCTION 2 II. NOTICES AND COMMUNICATIONS 3 III. STATEMENT OF BASIS AND PURPOSE OF THE PROPOSED REVISIONS TO THE RELIABILITY.
Size: 26 KB
Pages: n/a
Date: 2011-11-07
1 BEFORE THE PROVINCE OF MANITOBA NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION NOTICE OF FILING OF THE NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION OF MODIFICATION.
Size: 26 KB
Pages: n/a
Date: 2011-11-07
1 BEFORE THE NOVA SCOTIA UTILITIES AND REVIEW BOARD THE PROVINCE OF NOVA SCOTIA NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION NOTICE OF FILING.
Size: 26 KB
Pages: n/a
Date: 2011-06-16
1 BEFORE THE NATIONAL ENERGY BOARD NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION NOTICE OF FILING OF THE NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION.
Size: 83 KB
Pages: 23
Date: 2011-04-18
holly. hawkins nerc. net June 21, 2010 TABLE OF CONTENTS I. INTRODUCTION 2 II. NOTICES AND COMMUNICATIONS 3 III. STATEMENT OF BASIS AND PURPOSE OF THE PROPOSED REVISIONS TO THE RELIABILITY.
Size: 84 KB
Pages: 3
Date: 2011-04-01
NERCs Standards Process: Key Features for Industry Participants NERC Whitepaper 1 1 http://www. nerc. pdf.
Size: 258 KB
Pages: 16
Date: 2012-11-02
3353 Peachtree RoadNE Suite 600, North Tower Atlanta, GA 30326 404-446-2560 www. nerc. com Analysis of NERC S tandards Process Results.
Size: 739 KB
Pages: 96
Date: 2011-10-21
1 TABLE OF CONTENTS I. INTRODUCTION 2 II. NOTICES AND COMMUNICATIONS 3 III. STATEMENT OF BASIS AND PURPOSE OF THE PROPOSED REVISION 3TOTHE STANDARD PROCESSES MANUAL V. CONCLUSION 6 EXHIBITS.