08 May 09 Bidder C PRE BID QUERIES pdf
Size: 217 KB
Pages: n/a
Date: 2012-03-13
Related Documents
Size: 3 MB
Pages: n/a
Date: 2011-10-26
BID DOC. NO. – PRE BID MEETING HELD ON 18/12/2009 AT MECON BANGALORE PRE BID QUERIES BY PARTIES AND REPLIES GIVEN BY HPCL / MECON It is presumed that the contract is on item rate.
Size: 62 KB
Pages: 16
Date: 2011-02-04
1 PART A REPLIES TO THE QUERIES RAISED BY THE PROSPECTIVE BIDDERS ON THE BIDDING DOCUMENTS FOR THE WORKOF CONSTRUCTION OF EIGHT LANE ACCESS CONTROLLED EXPRESSWAY AS OUTER.
Size: 139 KB
Pages: 39
Date: 2010-11-12
1 PART-B REPLIES TO THE QUERIES RAISED BY THE PROSPECTIVE BIDDERS ON THE BIDDING DOCUMENTS FOR THE WORKOF CONSTRUCTION OF EIGHT LANE ACCESS CONTROLLED EXPRESSWAY AS OUTER.
Size: 53 KB
Pages: 10
Date: 2011-02-13
Reply of Pre-bid Queries Raised during/ for pre-bid conference held on 03/01/2011 Response to the queries raised by bidders for Pre-bid has been final.
Size: 165 KB
Pages: 27
Date: 2011-02-11
Reply of Pre-bid Queries Raised during /for pre-bid conference held on 3/01/2011 Response to the queries raised by bidders for Pre-bid has been.
Size: 477 KB
Pages: 476
Date: 2012-07-08
Modifications clarifications to pre-bid queries to RFP for Security Products implementation Management dated 26th June 2009 NOTE: 1. The Bidder has to give cross.
Size: 64 KB
Pages: n/a
Date: 2011-11-11
APITCO. 1 M/s. APITCO, Hyderabad Consultants for HPFS Replies to Pre-bid Queries received Second Time f rom Prospective Bidders for the Procurement of Hol ograms.
Size: 64 KB
Pages: n/a
Date: 2011-10-28
APITCO. 1 M/s. APITCO, Hyderabad Consultants for HPFS Replies to Pre-bid Queries received Second Time f rom Prospective Bidders for the Procurement of Hol ograms.
Size: 27 KB
Pages: 3
Date: 2011-10-21
Sub. : Replies to Pre-Bid queries of various Bidders for the work of construction of 33 kV/6. 6 kV, 2x16 MVA 2 nos. a nd 33 kV/3. 3 kV, 2 x 5 MVA 1 no. substations at Gevra Opencast Pr oject, SECL, NIT no. SECL/CGM.
Size: 181 KB
Pages: 1
Date: 2012-10-22
- Bid Queries Tender no: 12000084-HD- 10002 VENDOR : M/s Consilium Engineers India Pvt. Ltd. Sno Vendor Query HPCL Reply.
Size: 1 MB
Pages: 93
Date: 2012-10-22
Reference Volume/Para Number/page Points of Clarification required Clarifications to the Pre-Bid Queries No. of the Corrigendum II IV 1. Hardware, Page 3 S. No. 20 Minimum Specifications in the Tender document.
Size: 31 KB
Pages: n/a
Date: 2012-08-11
Higher Education Quality Enhancement Project HEQEP Format for Pre-Bid queries Title of IFB: Survey, Installation, Testing and Commissioning of Point.
Size: 151 KB
Pages: 6
Date: 2012-07-23
Response to Pre-Bid Queries Logistics Hub at Naya Raipur, Chhattisgarh July 2011 Naya Raipur Development Authority Page 1 of 6 No. Raipur, Date:.
Size: 100 KB
Pages: 10
Date: 2012-07-18
Page 1 of 10 Answers to the Pre-Bid queries against RFQ for Selection of Enro lment Agency for Punjab for Pha se II UID Enrolments Dated 30/04 /2012 S. No. Firm Clause.
Size: 128 KB
Pages: 2
Date: 2012-06-08
for Selection of Chartered Accountant Firm for Handling Accounting Financial Management Services at BSHB Response to Pre Bid Queries 1 Sl. 1. 2. will. 4. 9. 10.
Size: 147 KB
Pages: 6
Date: 2012-05-30
Pre Bid Queries for Request For Proposal for procurement of Laptops. Reference Number: HO/ITD/215/2012 S. No Request / Recommendation Remarks Banks Response 50 ea.
Size: 57 KB
Pages: 1
Date: 2012-05-07
³5DWH RQWUDFW for Providing Working Lunch / Dinner / Light Refreshment during :RUNVKRS 7UDLQLQJ 0HHWLQJ RUJDQLVHG E 5,6/´ Pre - Bid Queries dated.
Size: 1.7 MB
Pages: 11
Date: 2012-03-07
Page 1of 8 Reply to Pre Bid Queries For the work of Construction of Forest and Water Resources Department Buildings at Sector - 19 of Naya Raipur With reference to NIT No. 8/F WRD/EE--12,.
Size: 28 KB
Pages: n/a
Date: 2012-03-01
Page 1 of 2 Annexure -1 Clarification to Pre-Bid Queries RFP 042009 - Supply, Installation Commissioning of Hardware and Software for Centralised Cheque Processing Center. Sr No Page.
Size: 185 KB
Pages: n/a
Date: 2012-02-17
Subject: Miscellaneous Engineering Jobs for various technical studies and Engineering Solutions. Tender No. OC08000016/USH REPLIES TO PRE BID QUERIES Page 1 of35 ANNEXURE_I.
Size: 576 KB
Pages: 27
Date: 2011-12-16
RFP FOR SELECTION OF SYSTEM INTEGRATOR FOR CRIME CRIMINAL TRACKING NETWORK SYSTEM CCTNS INGOA PRE-BID QUERIES RELEASEDBY GOA ELECTRONICS LIMITED 05-12-2011.
Size: 238 KB
Pages: 2
Date: 2011-11-24
Size: 133 KB
Pages: n/a
Date: 2012-12-29
Clarifications to Pre-bid queries raised by Vendors on RFP for UAT of CLMAS and TALMSSr. No. Clause No. Page No,. RFP Provision Clarification Sought by Vendors Clarification Provided by NABARD.
Size: 183 KB
Pages: 3
Date: 2012-11-04
PRE‐BID QUERIES FOR DEVELOPMENT OF AQUARIUM AND BUILD, FINANCE, OPERATE AND TRANSFER BASIS AT RAJKOT Sr. No Pg. No Ref Section Clause Response .
Size: 394 KB
Pages: n/a
Date: 2011-11-04
CRIME CRIMINAL TRACKING NETWORING AND SYSTEM CCT NS -UK Name of the Document Pre-Bid Query Response Name of the project and reference details RFP reference number.
Size: 110 KB
Pages: 7
Date: 2011-10-24
RFP NO. 072010 CLARIFICATIONS / REPLIES TO TH E PRE-BID QUERIES HELD ON 15. 05. 2010 Clauses / Annexures to be modified Sl. No Page No. / Clause in the RFP 1 Page no. 37, Clause k i has been modified.
Size: 394 KB
Pages: n/a
Date: 2011-10-20
CRIME CRIMINAL TRACKING NETWORING AND SYSTEM CCT NS -UK Name of the Document Pre-Bid Query Response Name of the project and reference details RFP reference number.
Size: 110 KB
Pages: 7
Date: 2011-08-19
RFP NO. 072010 CLARIFICATIONS / REPLIES TO TH E PRE-BID QUERIES HELD ON 15. 05. 2010 Clauses / Annexures to be modified Sl. No Page No. / Clause in the RFP 1 Page no. 37, Clause k i has been modified.
Size: 28 KB
Pages: 3
Date: 2011-07-10
Clarification of Pre Bid queries on CSC RFP Nov 2010 for Zone 7, 8, 9 and 10 S. No Section Page No RFP Clause Company name - IL FS 1 RFP Volume 1 clause2. 3 23 NLSA As the role of NLSA has been transferred.
Size: 140 KB
Pages: n/a
Date: 2011-06-28
Sl. No. Corrigendum - Pre - Bid Queries Content of RFP requiring Points of clarifications Response 1 Pg no. 26, Section 3. 4, Existing Legacy Systems Decentralized CIPA AND CCIS Decentralized CIPA.
Size: 54 KB
Pages: n/a
Date: 2011-06-10
Sl. No. Document No. No. Clause No. / ReferenceBidder s QueryClients ReplyREPLY TO PRE BID QUERIES 32Vol VII of VIIR M Plan, Section 1. 1, 1. 2, 1. 3, 1. 4In the referred document, at Well No. 16 Off take point, 4 Nos. of MOV s will.
Size: 115 KB
Pages: 4
Date: 2013-06-01
NO. NO. 1 Process Datasheet Properties of Gas given under Normal Case to be considered for design of compressor package. normal case. However, compressor design.
Size: 278 KB
Pages: 2
Date: 2013-04-23
The pre- bid query reply ofthe RFP for Entering into Rate Contract for Security Audit of Websites Web Applications of various Rajasthan Government websites.
Size: 115 KB
Pages: 4
Date: 2013-04-02
NO. NO. 1 Process Datasheet Properties of Gas given under Normal Case to be considered for design of compressor package. normal case. However, compressor design.
Size: 433 KB
Pages: 11
Date: 2013-03-19
to pre bid queries on Testing and publishedon 21. 01. 2013 Sr, No Page No. and Clause Details Remarks/Change Request Clarifications NAIn NA.
Size: 433 KB
Pages: 11
Date: 2013-03-13
to pre bid queries on Testing and publishedon 21. 01. 2013 Sr, No Page No. and Clause Details Remarks/Change Request Clarifications NAIn NA.
Size: 29 KB
Pages: n/a
Date: 2013-03-07
Pre Bid Queries for Exploration, Mining and Supply of Black Stone from 1 Hatgacha Black Stone Deposit 2 Hatgacha - Jethia Black stone deposit.
Size: 217 KB
Pages: n/a
Date: 2012-03-13
Page 1 of33 FORM-N REFERENCE OF BIDDING DOCUMENT SL. NO. PART/ VOL. PageNo. Clause No. Subject BIDDER S QUERY OWNERS / PMC REPLY 1. Part I, Section.
Size: 217 KB
Pages: n/a
Date: 2012-08-22
Page 1 of33 FORM-N REFERENCE OF BIDDING DOCUMENT SL. NO. PART/ VOL. PageNo. Clause No. Subject BIDDER S QUERY OWNERS / PMC REPLY 1. Part I, Section.
Size: 157 KB
Pages: 25
Date: 2012-03-22
Bidder H Page 1 of25 FORM-N Pre Bid Queries Process REFERENCE OF BIDDING DOCUMENT 2. General Battery Limit Instrumentation Kindly specify the B/L instrumentation.
Size: 50 KB
Pages: n/a
Date: 2011-12-11
Clarifications to the Queries Raised by the Prospective Bidders during the Pre-Bid Meeting ADDENDUM TO THE RFP DOCUMENT Sr. No. Queries Clarification Whether the Bar License will be provided.
Size: 205 KB
Pages: 2
Date: 2012-05-06
Date: 03. 01. 2012 d/KE K Z E ,/ KZ D Eh dhZ/E E D Z d/E K /Zz WZK h d hE Z ͞s/: z Z E ͟ Bid No. 1138/GM Mktg. 2011 dated 23. 11. 2011 The following are the Clarifications to thePre-bid Queries raised by the Bidders.
Size: 424 KB
Pages: 20
Date: 2012-02-27
-SZ-IVSS Responses toPre-bid queries Page 1 of 20 Minutes of thepre-bid meeting of prospective bidders for theHPCL-IVSS Project Integrated Video Surveillance System.
Size: 87 KB
Pages: n/a
Date: 2012-12-31
PURA Project Response to queries of the2nd pre-bid meeting 1 Response to queries raised during the2nd pre-bid meeting Query No. Category.
Size: 87 KB
Pages: n/a
Date: 2011-11-02
PURA Project Response to queries of the2nd pre-bid meeting 1 Response to queries raised during the2nd pre-bid meeting Query No. Category.
Size: 27 KB
Pages: 2
Date: 2012-01-03
· East · Harbor · Mission · Pierce · Southwest · Trade-Technical · Valley · West District-wide Bid Notice to Bidders AV Data Projectors Page 1 of 2 Bid 117 NOTICE TO BIDDERS.
Size: 70 KB
Pages: n/a
Date: 2011-03-05
Page 1of 4 In response to the pre bid meeting held on 12. 02. 20 11 at 11. 00am at Chittoor as per the schedule menti oned in the bid document SGB/HO/RBD/FIS/ /2010-11, the Ba nk received the following queries and given.
Size: 22 KB
Pages: 2
Date: 2012-08-20
NOTICE TO BIDDERS :. org/, Contracting and Bidding Site, Universal Reprographics Online Plan Room Link To view in person.
Size: 70 KB
Pages: n/a
Date: 2011-05-28
Page 1of 4 In response to the pre bid meeting held on 12. 02. 20 11 at 11. 00am at Chittoor as per the schedule menti oned in the bid document SGB/HO/RBD/FIS/ /2010-11, the Ba nk received the following queries and given.
Size: 120 KB
Pages: 12
Date: 2012-06-29
1Â Â Answers of Pre-bid TENDER NO: REC/HR/TRG/Web Portal/2009-10 Queries Sl. no. 1. Extension of Time Line Implem entation to i 6-8 months ii 120 days. Ans. Time line is the essence.


Comments (not logged in)